Blacktop paving of the entire complex is complete. In addition, water drains were repaired and new grates were installed, Belgian block curbing was replaced/repaired and new line striping and parking space numbers were painted in green to blend with the landscape.
The paving project won’t be complete until the new blacktop has set-up, cured and sealed. Sealing the blacktop will be done next summer when temperatures are about 80 degrees.
Our Tulip Gardens reserve pays for this project. There is no assessment.